Large rooftop solar plants for factories in Pimpri Chinchwad, Chakan, Bhosari, Hinjewadi and Pune. We check your roof and shift timings first, then design a plant that truly saves.


Swipe to see more →
Cheaper daytime power directly improves your margins.
Large factory roofs are perfect for big solar plants.
Solar can qualify for accelerated depreciation. Check with your CA.
Quality panels and proper design keep output steady.
Factory roofs are made of metal sheets and purlins built for a certain load. Before we suggest a size, we make sure your roof can safely carry the panels. This avoids leaks and damage later.
We also look at your shifts. A factory that runs mainly in the day saves more from solar than one running round the clock, so we size the plant to match how you actually use power.
Based on about 120 solar units per kW per month in Pune.
| System size | Units per month | Roof space | Good for |
|---|---|---|---|
| 50 kW | about 6,000 | about 5,000 sq ft | Small workshop |
| 100 kW | about 12,000 | about 10,000 sq ft | Mid size factory shed |
| 250 kW | about 30,000 | about 25,000 sq ft | Large plant |
| 500 kW | about 60,000 | about 50,000 sq ft | Plant with many sheds |
| 1 MW | about 1,20,000 | about 1,00,000 sq ft | Industrial campus |
Final size depends on roof strength, sanctioned load and approvals.
Swipe to see all steps →
Roof structure, load, shifts and wiring checked on site.
Plant size, layout, savings and full cost in writing.
Planned with your safety team, without stopping production.
Generation tracking, cleaning and fast service whenever needed.
Usually yes, but we always check first. We look at the roof sheets, purlins and structure before suggesting any size, so there are no leaks or damage later.
Not when done properly. We use the right clamps for your sheet type, keep holes to a minimum and seal every fixing.
The PM Surya Ghar subsidy is only for homes. Factories save through lower bills and can often claim tax benefits. We also tell you about any current schemes that apply.
No. Roof work goes on while you work. The final connection needs a short planned shutdown, which we schedule on your weekly off.
Yes. If you plan to expand, tell us early and we will design the plant so more panels can be added easily.
Share your electricity bills and shift timings. We will suggest a plant size and savings, then confirm it with a free site study.